Thermal power plant reconstruction.

Aims:

  • Reduction in natural gas consumption
  • Optimisation of the heat transfer fluid distribution system

Achievable results:

  • Consumption reduction
  • Bill savings
  • Recoup time
  • Field measurements and survey of temperatures and flow of heat transfer fluid
  • combustion gas analysis
  • Installation of a condensing boiler with large water volume or a modular one based on the customer's requirements
  • Installation of inverter pumps on the distribution circuit, to allow flow modulation in the case of low and/or high heat requests of process fluid
  • Installation of a recovery system for combustion gases to use to preheat the combustion air at the burner inlet
  • Plant performance control through a remote monitoring and management system of main parameters (flow, pressure, humidity)
  • Design of the new thermal power plant and distribution system
  • Procedures for plant commissioning
    • INAIL
    • VVF business start-up certificate notification
  • Installation and testing

Request a consultation on Thermal power plant

Our experts are at your disposal.

Request a professional consultation without obligation. Your request will be evaluated by our consultants and you will be contacted as soon as possible to make an appointment.